Loading...

Quality Control

Strict quality control procedures are as following:

a. All drawings and samples will be reviewed by United States in house engineering staff before sending to China

b. Our Engineers evaluate all qualified factory

c. All raw material and components fully inspected before production.

d. Production inspection performed each stage, including on site measurement report and gauges;

e. Finished products to be strictly checked according to standards.

f. A final inspection is done before packing and delivery

Equipment

CIC is equipped with all necessary measuring and test equipment for the process and product control to ensure that the products meet customer design requirements.